Monday, February 7, 2011

Tibial Posterior Tendonitis

Feges alone at home - or: All is well!

Since it was on Saturday to clean up too dark, cold and wet (who has not eaten since actually his plate? How much rain ...), we can give us a key for the building doors and are on Sunday morning went to the Sleep in the house.

It has at this time for two days by rain and our property would be the perfect venue for ambitious Schlammcatching events - if interested please report, we give you something from the mud!

dry in the house even more. The bottom plate, the surface has melted on Saturday, is now in many places already dry. The cleanup went quicker than expected and yet we had just loaded with chalk, and Fotoapperat scale to measure out our house to photograph and to highlight minor defects, as a well-known white van stopped in front of the door and Chris just said "The construction workers are there." So no good from "Feges alone at home" was.

Thus, the construction schedule does not default, the DAB-boys yesterday, a special layer inserted and heal our ceiling. We had it first a slightly queasy feeling inside himself asked the anxious voice of my clients-the superego: "Now if that is even not a night and fog action ...", finally everything we wanted but only with our construction manager and Daniela discuss details. But now, well, progress is progress and the moisture meter can also be put through small holes in the ceiling and then seal it again. The construction workers have therefore removed the cut vapor barriers, determine whether the insulation mats are still moist and at Chris' request, they have replaced the mats at the places that were wet.



A exchanged insulating mat. Of the 13 Dämmmattenpaketen were at the end of the day not much left, since almost everything was replaced. Peace of mind.


Here's just a mat will be cut accordingly.


only were glued to the Trepenauschnitt the vapor barrier. The cotton was here on Friday completely dry and just to be careful, the steam locks open. In all other areas of the vapor barriers were replaced.

This Monday was the first major appointment and the result is: All is well! Our Baubegleiterin Daniela is completely satisfied with the design and execution quality. Balm for the soul builders! It was examined whether the insulation is dry and the wet wall was drilled to jobs and made a moisture test. Ask on the Daniela tacker were at the transitions of the steam bodies still sealed with adhesive tape.

Chris While visiting the body shop has taken over, I was wedged behind the front lines. Unfortunately I was not so successful: Our electricity and gas connections can continue in coming. Somehow, the already paved road present a problem for this week we are definitely not clocked for the port. Our construction manager will be again tomorrow because of the stream and ask around to find out what exactly is the problem. Wastewater and storm water but are made possible next week - then we may after all go to the bathroom. I have an internal bet with me running, I do not even go to sites once-Dixi-Klo :-)

0 comments: