Thursday, February 3, 2011

Chinese Straightening What Is It

... and suddenly we had a house!

is our house!

Does it not look great:
It is the culmination of timber frame construction! This most aerodynamic, elegance and grace!

But first things first.

This morning everything looked like this - our giant skeleton.


Then the first wall was flying through the air ...


... and landed next to the skeleton.



There she is. Fine neatly labeled. Well, our name is so short :-)


But then came the first "real" wall. Our south side of the entrance door that is already there, to our surprise.

Links
kitchen in the middle door, light strips, right HWR.




All wall collision points - how hot these things? - were glued neatly, so that vapor barriers are tight-1a.

Speaking tight! These were the clouds that is not today. In the morning it was drizzling quite a long time. Our walls were well protected with foil. Not only the poor mechanics.



Now comes the first interior wall - hallway / utility room.


links you can already see Supergut the kitchen.


behemoth, here is our heating. Jep! Exactly, our heating. The fact was summarily been lifted by the crane into the house.



Our guest bathroom.


Each wall has not yet received a pair of shoes.
It's amazing how routinely worked the assembly team. There sits every move.



Tataaaaa! The patio door opens for the first time.


course all distances were again measured it exactly.


And demand was even greater prominence bissl straight.


A window - unfortunately I do not remember which one:-p


These screws were connected to each other our house walls.


This is the last wall of the ground floor.

It was the morning just shortly before 10.00 clock!


And already the first truck was empty.




Our ground floor!



The second truck.


: Now the steel beam between the kitchen and dining room built.

Oh yes .... and look at our mess-room. One might think that we are already moved ...


Then came the first cover part!



Again, our guest bathroom - but this time shot from the inside!


The client inspects the HWR.




impressions à la cable.


The resemblance to a Swiss Cheese can be denied the sight of our house walls not:



The terrace door to the west side.



course, the vapor locks were glued to the floor. The roof box is already in light gray -



Our ceiling beams:


For Dackdecker among us deleted. Chic, right?


climbing acrobatics


And we are starting out on the floor. Can you remember you have the cute little, pink base plate? How quickly the little ones are great!



And the builders are small!



This is our kitchen ceiling, together with steel beams.


The walls for the floor.



law tiles from scaffolding, scaffolding behind the gleaming building owner.


More upstairs walls - all have cladding and filled.
The electrical cables were from a DAB-electrician immediately removed from the installation level.
With him we went rumgegangen also on the ground floor and have electrical outlets and lighting outlets once viewed. We have only slightly changed in the guest bathroom. Since we had, in fact no ceiling light and have now completed.





finished :-) Well, almost.

The permafrost is now passé. With the warmer temperatures, unfortunately, comes back and the mud and why I return as a good local resident of the street.


In fact, I've just the stress endured no longer needed and what to do. Before that, I'm obviously down to the hardware store to buy brooms, shovels and one or the other odds and ends. The heater in the car was great! Eventually, the cold pierces through 5 layers of clothing including long underwear and ski socks.

This is our bedroom.


And that's more cheese holes :-)


Our hallway with light band.


Well, what could it be?


Right! Left is the shower!

then also got the floor, a ceiling. Meanwhile, there was
about 4 clock. As it was already dark at just after 5, the assembly of the roof was not preferred. The future is criticized.


The exhausted developer




called our junk room "future living room." Where we want to celebrate because on Saturday, is still a mystery to me, but somehow it will work.


That's it for today.
We are fixed and all, very happy and after a hot shower again in possession of all body functions.

The balance of the day:

gefutterte 16 Kuchenteilchen
four pots of coffee
2 packets biscuits
a happy building owner
a happy client
6 Toll House fitters
two finished floors
at least 10 visitors (funny, who's here and so all the Site seeing)
verschusselte 2 inch sticks (it will not be the last)
238 Photos




0 comments:

Post a Comment