Tuesday, February 8, 2011

Copd Exacabation Symptons

greets the spring!

At this point I would love to send greetings to all Solingen. In Solingen arises namely also currently a DAB-house! The state of things finds her at: http://bautagebuch-sg.blogspot.com/2011/02/der-fruhling-lasst-gruen.html

Springlike 18 ° C we did not, but here in Berlin We are having 6 to 9 ° C completely satisfied. This has now let the sun look. I ended up doing the same used to our house between school and university to pay a short visit. Our diligent craftsmen I've brought in the oppurtunities rolls, sausage, cheese and meatballs for a little lunch - with a full stomach, it works well or even better!

worked and was a lot again today. When I came, I was just the drinks and stop eating before I was sent to the artisans to the top "head, look up!" And above has changed a lot in fact. After yesterday inspected the insulation and vapor barrier and was found to be dry today Fermacell plates were mounted on the ceilings.

Here you can see, are as measured on the one Fermacell for cutting. On the other floors are processed before the full-length windows on the upper floor. I have no idea what was being done exactly :-) window sills so there should not really be installed ...


The bedroom ceiling.


Our toilet in the bathroom


The Swiss cheese holes were sealed neatly.


Meanwhile, the connections have been established for our towel radiators. Since the distance to the shower and bath tub was not big enough, it will be no electric heater have. That's sad, but unfortunately no other way.


A look into the stairwell. The windows of the light bands are still covered with blue film, otherwise you would now see the sun in the hallway seem.


New Impressions à la cable!


Here you see the consequences of our major electric Aufmusterung.


hoses, cables and more tubes in the HWR.


the south side. On the framework have already been reserved between the tiles. cover is finished tomorrow.


The south-west corner


the north side and the neighbor's yard


Inside the house has for the topping again kept the chaos catchment. From chipping, breaking eggs, it is so beautiful. The Ordnungsfanatikerin in me arises at the sight but already the question of how out of it will ever be a cozy living / dining room including open kitchen. Yeah, I know the house is not even a week, Rome was not built in a day and good things take time have ...



After yesterday regarding our current connection duster over looked, is now come to light dark (what a pun!). My yesterday's phone call to the tear glands of the Terminkoordinierin the exporting company and the insistence of our construction manager (Thanks a million!) Have ensured that we get our connectivity on Thursday. Really should come first, only the site power, but if we dig a 60cm-deep trench from the house, until the scaffold is probably already the right home port will be added. Chris has now digging past closing time and made already begun. On Thursday, he has to take time off to get to the pit ready, but what you do not everything for their own electricity.

0 comments:

Post a Comment