Tuesday, March 8, 2011

Female Bedwetter Plastic Pants

Great delivery - Part 2 - Or help where is the place?

If my husband does not recommend the evening again to drive past on the construction site or in the morning quite early, there is a reason. Actually, I can suppress my order and clean-up needs quite successful (what you see on the state of our Wohnng), but after today, all floor coverings have been delivered, and three (sometimes even four!) Trades at the same time were working in the house, I would, given the vast amounts to get materials, boxes, crates, cartons, boxes, packages, pallets and packaging, probably the crisis. And I did yesterday still extra fashioned a makeshift entrance staircase from a palette and remaining battens and even designed the way to the Dixi-Klo in boards; so not that much dirt in your house is. But nothing helped, as the carrier, who delivered the tiles, the range has wisely placed directly on the said road to Dixi-Klo. By Chris had balanced it all into the house, the plan was "no power to the soil!" failed miserably.
Our entire ground floor is so cluttered. Even the towel radiator came today direct from the manufacturer. Fortunately, everything is built quickly (or at least the part that is not because of our orders in the house.): Tomorrow is mounted our snow guard (since the last two winters, is the Berlin area is well known in the "multi-snow area"), the stairs We installed the heater is completely installed, the tile tiles and so on. It's growing and growing. Now only the outer plaster it, so that the scaffolding away and our sewer connection can be established. At least my plan, "No power to the Dixi-Klo" but must work! So far I'm still the clear winner!

0 comments:

Post a Comment