
56 solder joints were brazed and are sealed!

The copper pipes I have already covered with insulation.

but unfortunately I missed 1.5m insulation material. I'll get me for € 0.98 at the hardware store ;-)

heaters have already started and spread a pleasant warmth.

Even the closet is already joined. On weekends it can be re-admitted.

The grouting works better and better.
0 comments:
Post a Comment